SNOWFLAKE PATHWAYS

A HISTORY IN PICTURES


line.gif - 3.0 K


2006: Detour


All the wooden bridges in the green belt have detour trails bypassing them in case they get slippery in icy conditions. In October, 2006, I built this pathway going around the two foot bridges that were just installed the month before.




(345) ^ ^ ^ ^ This is what the original trail going to the Enchanted Forest looked like (looking west).




(346) ^ ^ ^ ^ Same trail looking east.




(347) ^ ^ ^ ^ Using this same route, rock borders were added.




(348) ^ ^ ^ ^ Another view.




(349) ^ ^ ^ ^ Ready for wood chipping.




(350) ^ ^ ^ ^ Wood chips had to be wheel barrowed in from Alpen Court along existing pathways.




(351) ^ ^ ^ ^ Laying down the wood chips.




(352) ^ ^ ^ ^ Looking back the other way.




(353) ^ ^ ^ ^ The junction with the Main Pathway.




line.gif - 3.0 K



  top.jpg - 1.98 K  
back.jpg - 2.28 K   next.jpg - 2.20 K
  home.jpg - 2.13 K